Hello,
I was reviewing the last update on Crowd Supply for the EOMA68 campaign [1],
and taking information from that and from discussions on this list, it seems
that the following timeline was being followed:
15th June: Crowd Supply update, prototype tested, DRAM tested and ordered,
HDMI not tested
Late July: DRAM manufactured ("about a month to have the 8 Gbit 1600 MHz
DDR3 x8 RAM ICs manufactured"), assembly begins (working from
"three months after getting the cards back from assembly before
shipping begins")
Late October: "delivery of the first units" (presumably "delivery" is the
same as "shipping", meaning "dispatch" from Crowd Supply)
I hope that things have been proceeding as anticipated. August was a quiet
month on this list, and I imagine that Luke has been very busy with all his
projects, but I wonder if there is any news about whether the DRAM
manufacturer came through, whether assembly could start, whether testing might
have begun (and was hopefully a success), and so on. I imagine that there is
also the awkward matter of getting the boards from China to the US, related
bureaucracy, and other complicating factors.
Anyway, I hope everything is going well, that Luke isn't overworked, and that
I didn't miss something that would have made the current state of the schedule
a bit clearer.
Paul